Published on 13th April 2012
ECR Minerals has announced that it has so far completed eight drill holes out of nine at the Sierra de las Minas gold project area in Argentina. Samples from six of these have been sent for testing, with results expected in two to three weeks. The current programme is planned to consist of 12 holes totaling 1,000 metres, with the option of drilling a further 1,000 metres.