AltynGold (ALTN)

Sector:

Mining

129.00p
   
  • Change Today:
      1.00p
  • 52 Week High: 136.00
  • 52 Week Low: 82.25
  • Currency: UK Pounds
  • Shares Issued: 27.33m
  • Volume: 31,780
  • Market Cap: £35.26m

Resources round-up: Highland Gold, Rialto, Chaarat...

Date: Thursday 12 Jul 2012

  • Also included in this round-up: Goldstone, Landore Resources, Hambledon Mining and Amur Minerals

LONDON (ShareCast) - Highland Gold Mining has completed its acquistion of Klen, which holds the mining and exploration rights to the Klen gold deposit and the adjacent Verkhne-Krichalskaya property located in the Chukotka autonomous region in north-eastern Russia. The company is planning to mine the deposit by open pit method and will employ conventional gravity and cyanidation processing technology. The expected production should range from 50,000 - 60,000 oz of gold per annum with 300,000 - 400,000 tonnes of ore being processed each year, having an average head grade of 5.14g per tonne.

Rialto Energy has begun its drill stem-testing programme on the Gazelle-P3 ST2 well, Abidjan, Côte d'Ivoire, which will take around two weeks to complete. After completion of the drill stem testing Rialto intends to suspend the well to allow for future completion as a Gazelle Field production well.

The suspension has been lifted on Chaarat's gold Tulkubash project in the Kyrgyz Republic and the firm now expects gold production to begin in the second half of 2013. The company has welcomed new legislation which provides clarity and long term stability without the need for the negotiation of an investment agreement. "Our progress to production can now continue without the need for further negotiation on stabilisation with the Kyrgyz Government," the firm said.

Goldstone has reported new drilling results which confirm depth extensions of the Homase/Akrokerri gold resource, where 51 drill holes, totally 14,3476 metres have been completed. The firm has suspended drilling temporarily and is using the results to establish whether the veins have economic potential. Assay results for an additional 20 drill holes completed along the Homase/Akrokerri trend are pending.

Landore Resources has said that the recently completed drilling campaign on the B4-7 deposit at the junior lake nickel project has significantly enhanced the volume of sulphide mineralisation along the 650 metres of strike length delineated to date. 81 diamond core holes and four re-entered holes have been completed. 26,521 tonnes of nickel equivalent at a 0.25% nickel cut-off were reported at the deposit.

Looking forward the company is planning an in-house resource upgrade which it will then submit for an upgrade of the desposit, which it anticipates will occur in the fourth quarter of 2012. A drilling programme to extend the deposit to the west is planning for the same time, and pre-feasibility studies on both BW-7 and VW are planned for the following quarter.

Amur Minerals has announced that the 2012 exploration field programme is now fully operational. Drilling is planned for 14 holes to test for the presence of nickel and copper. Four holes completed along one section have confirmed the presence of the nickel and copper sulphide host zone within three out of four. Drilling of the fourth hole was terminated short of the targeted host zone due to poor ground conditions. A newly purchased diamond core rig is said to be operating well and is expected to save $165 per metre.

Hambledon Mining has said gold production for the quarter ended June 30th of 5,917 ounces was in line with management expectations, although this was held back slightly by the constraint in tailings disposal from the process plant during some remedial works. There were 'modest' amounts of ore extracted from the underground mine. Recovery levels are currently at 78-9%, short of the 81% aimed for by the company. Remedial works to modify the plant are on-going and are expected to be complete early on in the fourth quarter of this year. A total of 179,156 milled tonnes were produced during the period at a grade of 1.28g per tonne. Total recovered silver was 6,856 oz and the total recoved gold was 5,840 oz.

NR

Email this article to a friend

or share it with one of these popular networks:


Note 1: Prices and trades are provided by Digital Look Corporate Solutions and are delayed by at least 15 minutes.

 

AltynGold Market Data

Currency UK Pounds
Share Price 129.00p
Change Today 1.00p
% Change 0.78 %
52 Week High 136.00
52 Week Low 82.25
Volume 31,780
Shares Issued 27.33m
Market Cap £35.26m

AltynGold Star Ratings

Compare performance with the sector and the market.
more star ratings
Key: vs Market vs Sector
Value
87.71% above the market average87.71% above the market average87.71% above the market average87.71% above the market average87.71% above the market average
89.39% above the sector average89.39% above the sector average89.39% above the sector average89.39% above the sector average89.39% above the sector average
Price Trend
41.28% above the market average41.28% above the market average41.28% above the market average41.28% above the market average41.28% above the market average
65.52% above the sector average65.52% above the sector average65.52% above the sector average65.52% above the sector average65.52% above the sector average
Income Not Available
Growth
73.46% above the market average73.46% above the market average73.46% above the market average73.46% above the market average73.46% above the market average
77.78% above the sector average77.78% above the sector average77.78% above the sector average77.78% above the sector average77.78% above the sector average

AltynGold Dividends

No dividends found

Trades for 24-Apr-2024

Time Volume / Share Price
14:20 1,789 @ 129.00p
14:04 1,500 @ 132.00p
14:03 1,500 @ 132.00p
14:03 1,500 @ 132.00p
13:52 1,000 @ 129.00p

AltynGold Key Personnel

CEO Aidar Assaubeyev
Chair Kanat Assaubayev

Top of Page