Power Metal Resources (POW)

Sector:

Mining

Index:

FTSE AIM All-Share

13.25p
   
  • Change Today:
    -0.15p
  • 52 Week High: 22.50
  • 52 Week Low: 10.00
  • Currency: UK Pounds
  • Shares Issued: 110.67m
  • Volume: 468,265
  • Market Cap: £14.66m
  • RiskGrade: 378
  • Beta: 0.04

African Battery Metals to continue work in Cameroon following review

By Josh White

Date: Wednesday 03 Apr 2019

LONDON (ShareCast) - (Sharecast News) - Battery metal exploration and development company African Battery Metals updated the market in its Cameroon cobalt-nickel project interests on Wednesday, confirming that an updated review had been undertaken across its four licenses at Ngoila Nord, Ngoila Est, Ekok and N'dja, and also in respect of its two licence applications at Ntam Est and N'Gaoundere;
The AIM-traded firm said the original rationale for it to acquire the licences in August last year had been reviewed and confirmed, being the proximity and geological similarity to the Geovic Mining Nkamouna deposit;

Geovic had published an NI 43-101 compliant mineral resource on the Nkamouna deposit with a total measured, indicated and inferred resource of 323mt of 0.21% cobalt, 0.61% nickel and 1.26% manganese.

African Battery Minerals also noted that Geovic had published an NI 43-101 compliant mineral reserve on the same Nkamouna deposit, showing proven and probable results of 0.26% cobalt, 0.66% nickel and 1.48% manganese.

Aside from the resource delineated at Nkamouna, Geovic jad also identified cobalt-nickel mineralisation in five other blocks, being Rapodjombo, North Mang, South Mang, Messia and Kondong, in the same region.

The company said that as a result, it believed that there was "the possibility" of more cobalt-nickel mineralisation in the area other than the large resource delineated by Geovic.

Nkamouna remained, to the firm's best knowledge, the largest undeveloped cobalt resource globally outside the Democratic Republic of the Congo, African Battery Minerals said.

It reported that a desktop study undertaken by Sahara Natural Resources, which was completed in June last year, had been reviewed with the report ranking the company's interests in order of technical priority.

Follow-up site visits were conducted by Sahara in October, with sampling undertaken within one metre of surface.

However, the lateritic environment required deeper sampling methods as demonstrated by the work undertaken at the Geovic project, which indicated that the mineralised horizons were below six metres.

The firm said the review work undertaken as part of its strategic and operational planning had confirmed that the Cameroon Project should be continued, with a forward work programme now being devised.

An "efficient and economical" work programme would be undertaken, the board said, prioritising the highest profile targets as determined from the work undertaken and reviewed to date.

"I am pleased to confirm that the company, following a review of all available information and liaison with our in-country partners, has decided to continue our work in Cameroon, where the tenements held are seen as highly prospective for elevated grades of nickel and cobalt," said African Battery Minerals executive director Paul Johnson.

"ABM is now continuing work in respect of both the DRC and Cameroon projects, utilising the information gathered to date to identify an optimal pathway to value generation for investors.

"The proximity and geological similarity of our interests to the Nkamouna deposit is highly attractive, particularly give the scale of Nkamouna."

Furthermore, Johnson said the company's team had identified what appeared to be a cost-effective exploration methodology to test mineralisation on its license areas which should, - without "too much" further delay - demonstrate the potential prospectivity of the license ground.

"I look forward to providing further information in respect of our planned exploration in-country, which ideally we would like to commence as soon as possible to enable work to be completed prior to the heavy rains expected after June."

Email this article to a friend

or share it with one of these popular networks:


Note 1: Prices and trades are provided by Digital Look Corporate Solutions and are delayed by at least 15 minutes.

Note 2: RiskGrade figures are provided by RiskMetrics.

 

POW Market Data

Currency UK Pounds
Share Price 13.25p
Change Today -0.15p
% Change -1.12 %
52 Week High 22.50
52 Week Low 10.00
Volume 468,265
Shares Issued 110.67m
Market Cap £14.66m
Beta 0.04
RiskGrade 378

POW Star Ratings

Compare performance with the sector and the market.
more star ratings
Key: vs Market vs Sector
Value
27.45% below the market average27.45% below the market average27.45% below the market average27.45% below the market average27.45% below the market average
58.21% below the sector average58.21% below the sector average58.21% below the sector average58.21% below the sector average58.21% below the sector average
Price Trend
43.93% below the market average43.93% below the market average43.93% below the market average43.93% below the market average43.93% below the market average
3.45% above the sector average3.45% above the sector average3.45% above the sector average3.45% above the sector average3.45% above the sector average
Income Not Available
Growth
55.40% above the market average55.40% above the market average55.40% above the market average55.40% above the market average55.40% above the market average
71.43% above the sector average71.43% above the sector average71.43% above the sector average71.43% above the sector average71.43% above the sector average

POW Dividends

No dividends found

Trades for 01-May-2024

Time Volume / Share Price
16:29 50,000 @ 13.44p
16:27 559 @ 13.43p
16:27 25,833 @ 13.13p
15:52 51 @ 13.50p
13:26 4,033 @ 13.00p

Top of Page