Oriole Resources (ORR)

Sector:

Mining

Index:

FTSE AIM All-Share

0.38p
   
  • Change Today:
      0.025p
  • 52 Week High: 0.41
  • 52 Week Low: 0.15
  • Currency: UK Pounds
  • Shares Issued: 3,895.87m
  • Volume: 32,544,830
  • Market Cap: £14.80m

Deal with Barclays    Trade now with Barclays Stockbrokers

Oriole reports further positive drilling results from Mbe

By Josh White

Date: Tuesday 24 Jun 2025

LONDON (ShareCast) - (Sharecast News) - Oriole Resources reported further positive drilling results from its maiden campaign at the Mbe gold project in Cameroon on Tuesday, and confirmed the start of a JORC-compliant Exploration Target estimation for the MB01 prospect.
The AIM-traded company said the developments marked a significant step forward in assessing the project's resource potential.

It said the latest assay results from hole MBDD013 included two metres at 3.21 grams of gold per tonne from 149 metres, including one metre at 6.03 grams per tonne, as well as 6.35 metres at 0.52 grams per tonne from near surface and one metre at 3.24 grams per tonne from 128.10 metres.

The hole was drilled at the western end of a mineralised fence line where previous results, such as 21.3 metres at 1.61 grams per tonne from hole MBDD012, had already demonstrated broad zones of gold mineralisation.

To date, over 70% of the fully funded phase one drill programme has been completed, with 4,918.90 metres drilled across 16 holes, and a 17th hole in progress.

Results from holes MBDD014 to MBDD017 were expected in the third quarter of the year.

The drill campaign had confirmed sub-surface gold mineralisation over a strike length of at least 200 metres, a width of up to 400 metres, and to a vertical depth of at least 290 metres.

Oriole noted that the system remained open in all directions and at depth, providing scope for further resource expansion.

The results from the first 13 holes, alongside data from 2024 trenching programmes, would now be used to support an independent JORC exploration target estimate for the MB01 prospect, due early in the third quarter.

Oriole anticipated publishing a maiden pit-constrained mineral resource estimate for the wider project in the fourth quarter.

"The Mbe maiden drilling programme continues to make good progress," said chief executive Martin Rosser.

"Importantly, now that we have the results for holes MBDD001 to MBDD013, and along with the 2024 trenching programmes' data, our independent consultant can produce a JORC exploration target estimation for the MB01 prospect.

"We anticipate that the estimate will be published early in the third quarter of 2025 and will provide valued early guidance on the resource potential of the project."

At 1250 BST, shares in Oriole Resources were down 5.22% at 0.22p.

Reporting by Josh White for Sharecast.com.

Email this article to a friend

or share it with one of these popular networks:


Note 1: Prices and trades are provided by Digital Look Corporate Solutions and are delayed by at least 15 minutes.

 

ORR Market Data

Currency UK Pounds
Share Price 0.38p
Change Today 0.025p
% Change 7.04 %
52 Week High 0.41
52 Week Low 0.15
Volume 32,544,830
Shares Issued 3,895.87m
Market Cap £14.80m

ORR Star Ratings

Compare performance with the sector and the market.
more star ratings
Key: vs Market vs Sector
Value
73.29% above the market average73.29% above the market average73.29% above the market average73.29% above the market average73.29% above the market average
77.95% above the sector average77.95% above the sector average77.95% above the sector average77.95% above the sector average77.95% above the sector average
Price Trend
25.56% below the market average25.56% below the market average25.56% below the market average25.56% below the market average25.56% below the market average
5.19% below the sector average5.19% below the sector average5.19% below the sector average5.19% below the sector average5.19% below the sector average
Income Not Available
Growth Not Available

ORR Dividends

No dividends found

Trades for 28-Aug-2025

Time Volume / Share Price
08:47 30,000 @ 0.39p
08:46 3,000,000 @ 0.38p
08:45 2,000,000 @ 0.38p
08:45 2,500,000 @ 0.38p
08:44 644,304 @ 0.37p

ORR Key Personnel

CFO Robert Smeeton
CEO Martin Rosser

Top of Page