Bluejay Mining (JAY)

Sector:

Mining

Index:

FTSE AIM All-Share

0.33p
   
  • Change Today:
      0.030p
  • 52 Week High: 2.86p
  • 52 Week Low: 0.27p
  • Currency: UK Pounds
  • Shares Issued: 1,506.06m
  • Volume: 39,422,419
  • Market Cap: £4.97m
  • RiskGrade: 406

Deal with Barclays    Trade now with Barclays Stockbrokers

Bluejay partner Rio Tinto approves further spending in Finland

By Josh White

Date: Monday 27 Sep 2021

LONDON (ShareCast) - (Sharecast News) - Greenland and Finland-focussed exploration and development company Bluejay Mining announced the approval and extension of further exploration expenditure by its joint venture partner Rio Tinto Mining and Exploration on Monday, at the Enonkoski nickel-copper-cobalt project in eastern Finland.
The AIM-traded firm said the expenditure was part of the joint venture and earn-in agreement with Rio Tinto, announced on 10 November.

It said the Enonkoski joint venture drilling phase began in May and June, and targeted mineralisation in the near-mine areas Tevanjoki and Laukunsuo, being followed by a period of analysis carried out by the joint venture partners.

Based on drilling and the continuous evaluation of existing data and the regional belt, the drilling was being continued.

Geological mapping and sampling had been ongoing at the Enonkoski Belt, with historical drill core has re-logged and sampled, a top of bedrock sampling programme started in mid-August, and a detailed approximate-2,000 line kilometre vertical take-off fixed-wing UAV 3C magnetic survey finished in early September.

Planning for the upcoming diamond drill programme was ongoing, and preliminary plans including 3,000 to 4,000 metres of drilling to be conducted in October to December at several target areas on the belt.

"I am delighted to report that our joint venture partner Rio Tinto has decided to extend the exploration activities at our Enonkoski project in east Finland," said Thomas Levin, chief operating officer of Bluejay subsidiary FinnAust Mining Finland.

"The field team has been continuing with the geological field work at several target areas on the belt.

"The aim with the ongoing top of bedrock sampling and recently completed, very detailed, 20 to 40 metre line spacing drone three-component magnetic survey, is to assist in the target generation for the upcoming diamond drilling programme."

At 1048 BST, shares in Bluejay Mining were up 1.34% at 11.37p.

Email this article to a friend

or share it with one of these popular networks:


Note 1: Prices and trades are provided by Digital Look Corporate Solutions and are delayed by at least 15 minutes.

Note 2: RiskGrade figures are provided by RiskMetrics.

 

Bluejay Mining Market Data

Currency UK Pounds
Share Price 0.33p
Change Today 0.030p
% Change 10.00 %
52 Week High 2.86p
52 Week Low 0.27p
Volume 39,422,419
Shares Issued 1,506.06m
Market Cap £4.97m
RiskGrade 406

Bluejay Mining Star Ratings

Compare performance with the sector and the market.
more star ratings
Key: vs Market vs Sector
Value
80.29% above the market average80.29% above the market average80.29% above the market average80.29% above the market average80.29% above the market average
76.47% above the sector average76.47% above the sector average76.47% above the sector average76.47% above the sector average76.47% above the sector average
Price Trend
97.1% below the market average97.1% below the market average97.1% below the market average97.1% below the market average97.1% below the market average
100% below the sector average100% below the sector average100% below the sector average100% below the sector average100% below the sector average
Income Not Available
Growth Not Available

Bluejay Mining Dividends

No dividends found

Trades for 17-May-2024

Time Volume / Share Price
16:29 100,000 @ 0.33p
16:29 16,465 @ 0.33p
16:21 1,500,000 @ 0.33p
16:13 598 @ 0.33p
16:13 1,000,000 @ 0.33p

Top of Page